Analyst Bootcamp Join on TelegramJoin
Drill #48 · 2026-11-23

Work order start with material check

Work order start with material check: sequence diagram (AS-IS · Start work order today)
AS-IS · Start work order today · hand-drawn sequence diagram: how things work today, the starting point for the task

The situation

You are a junior business analyst on the production team at ForgeLine, a mid-size manufacturer using the SteelFlow Manufacturing Execution System (MES) linked to SAP (Systems, Applications, and Products) ERP.

Supervisor Maya: "If material is missing we need an automatic request and a supervisor alert within 5 minutes."

Log excerpt: Start WO log entry

12:04:12 POST /mes/start WO123 -> ERP:get_details
12:04:12 POST /mes/inv/check -> Inv:stock=out_of_stock
12:04:13 MES->MES:create_material_req WO123
12:04:13 MES->UI:alert material shortage

Your task

  1. Create a use case for "Start Work Order" covering pre-conditions, main flow, material-shortage alternative.
  2. List the business rules that apply.

What this use case specification exercise trains for business analysts

Write a structured use case (main flow, alternatives, exceptions, pre/post conditions) for a concrete interaction. The setting is manufacturing (mes/erp): work orders, BOM, shifts, quality checks, scrap, equipment downtime, material requests.

Typical deliverables for this kind of task:

  • use case with main, alternative and exception flows
  • pre/post conditions
  • business rules referenced

Junior level: one clear question, small inputs, 1-2 deliverables, no hidden traps beyond one edge case. Budget 10–40 minutes.

#mes#erp

Read the theory first