Drill #48 · 2026-11-23
Work order start with material check

The situation
You are a junior business analyst on the production team at ForgeLine, a mid-size manufacturer using the SteelFlow Manufacturing Execution System (MES) linked to SAP (Systems, Applications, and Products) ERP.
Supervisor Maya: "If material is missing we need an automatic request and a supervisor alert within 5 minutes."
Log excerpt: Start WO log entry
12:04:12 POST /mes/start WO123 -> ERP:get_details 12:04:12 POST /mes/inv/check -> Inv:stock=out_of_stock 12:04:13 MES->MES:create_material_req WO123 12:04:13 MES->UI:alert material shortage
Your task
- Create a use case for "Start Work Order" covering pre-conditions, main flow, material-shortage alternative.
- List the business rules that apply.
What this use case specification exercise trains for business analysts
Write a structured use case (main flow, alternatives, exceptions, pre/post conditions) for a concrete interaction. The setting is manufacturing (mes/erp): work orders, BOM, shifts, quality checks, scrap, equipment downtime, material requests.
Typical deliverables for this kind of task:
- use case with main, alternative and exception flows
- pre/post conditions
- business rules referenced
Junior level: one clear question, small inputs, 1-2 deliverables, no hidden traps beyond one edge case. Budget 10–40 minutes.